Fix#35781, #27472
Backport #35819
The PR will not correct the wrong numbers automatically.
There is a cron task `check_repo_stats` which will be run when Gitea
start or midnight. It will correct the numbers.
Backport #35793 by @silverwind
During https://github.com/go-gitea/gitea/issues/35790, it was noticed
that this PNG image had the wrong file extension. I also verified
`dingtalk.ico` and that one is actually an `.ico`.
Co-authored-by: silverwind <me@silverwind.io>
Backport #35783Fix#35780, fix#35782
Rerunning a job or a run is only allowed when the job is done and the
run is done.
Related PR: #3497098ff7d0773/routers/web/repo/actions/view.go (L239)
We don't need to check run status again in `rerunJob` because the run
status has been changed before `rerunJob`.
---
In fact, the bug described in the above issues will not occur on the
main branch. Because `getRunJobs` is called before updating the run.
98ff7d0773/routers/web/repo/actions/view.go (L425-L435)
So the run status that `rerunJob` checks is the old status.
---------
Co-authored-by: wxiaoguang <wxiaoguang@gmail.com>
Backport #35739 by wxiaoguang
This is a follow up for #35662, and also fix#31181, help #30275, fix
#31161
Co-authored-by: wxiaoguang <wxiaoguang@gmail.com>
Backport #35679 by surya-purohit
shows the main LFS filesize instead of the pointer filesize when viewing
a file
Co-authored-by: Surya Purohit <suryaprakash.sharma@sourcefuse.com>
Co-authored-by: wxiaoguang <wxiaoguang@gmail.com>
Backport #35647
This PR moved the creation of pushing comments before pull request
mergeable checking. So that when the pull request status changed, the
comments should have been created.
Co-authored-by: wxiaoguang <wxiaoguang@gmail.com>
Backport #35604 by silverwind
The test calls out to a web service which may be down or unreachable as
seen in the linked issue. It's better for tests to not have such
external dependencies to make them absolutely stable.
Fixes: https://github.com/go-gitea/gitea/issues/35571
Co-authored-by: silverwind <me@silverwind.io>
Backport #35610 by @surya-purohit
Updates the swagger documentation for the `diffpatch` API endpoint.
The request body is corrected from the outdated `UpdateFileOptions` to
the current `ApplyDiffPatchOptions` to match the code implementation.
Closes [issue#35602](https://github.com/go-gitea/gitea/issues/35602)
---------
Co-authored-by: Surya Purohit <suryaprakash.sharma@sourcefuse.com>
Co-authored-by: wxiaoguang <wxiaoguang@gmail.com>
Co-authored-by: Lunny Xiao <xiaolunwen@gmail.com>
Backport #35584 by @shashank-netapp
# Summary
The Gitea codebase was logging `Elasticsearch` and `Meilisearch`
connection strings directly to log files without sanitizing them. Since
connection strings often contain credentials in the format
`protocol://username:password@host:port`, this resulted in passwords
being exposed in plain text in log output.
Fix:
- wrapped all instances of setting.Indexer.RepoConnStr and
setting.Indexer.IssueConnStr with the `util.SanitizeCredentialURLs()`
function before logging them.
Fixes: #35530
Co-authored-by: shashank-netapp <108022276+shashank-netapp@users.noreply.github.com>
Co-authored-by: Lunny Xiao <xiaolunwen@gmail.com>
This pull request updates the handling of issue label events in
workflows to distinguish between label additions and deletions,
introduces corresponding test cases, and extends the `IssuePayload`
structure to support this functionality.
### Enhancements to issue label event handling:
* Updated `matchIssuesEvent` in `modules/actions/workflows.go` to
differentiate between "labeled" and "unlabeled" events based on whether
labels were added or removed.
* Added a new field, `RemovedLabels`, to the `IssuePayload` struct in
`modules/structs/hook.go` to track labels that were removed during an
issue event.
### Testing improvements:
* Added `TestMatchIssuesEvent` in `modules/actions/workflows_test.go` to
cover scenarios such as label addition, label deletion, and label
clearing, ensuring the correct event type is triggered.
---------
Co-authored-by: Lunny Xiao <xiaolunwen@gmail.com>